RC Infrastructure

Case study / Power & HV

Feeder station upgrade programme.

Design and install works to upgrade protection and control on feeder stations supporting mainline AC electrification. Energised without service disruption.

Looking up at the steel gantries, busbars and brown porcelain insulators of an outdoor high-voltage substation against a blue sky.
Fig. 6.1Steelwork, busbars and porcelain insulators in an outdoor high-voltage compound.
Value band
£8m
Duration
18 months
Status
Delivered

01Summary

Client, value and status at a glance.

Client
Tier-one alliance
Capability
Power & HV
Region
North
Value band
£8m
Duration
18 months
Status
Delivered

02The work

What it took, and how it ended.

  1. The challenge

    Upgrading the supply the railway was still using.

    Protection and control had to be replaced on feeder stations that support mainline AC electrification, so each changeover was planned around the traction supply the railway needed.

  2. What we delivered

    Protection and control, designed and installed in-house.

    Detailed design, installation, testing and commissioning of the upgraded protection and control systems across the programme.

  3. Outcome

    Energised without service disruption.

    The upgraded feeder stations were energised without disruption to passenger services.

Next step

Delivering a similar scheme? Talk to the team behind this one.

References and full project documentation are available on PQQ or tender request.