Case study / Rail
Metro depot electrification.
Full OLE, HV and enabling civils package for a new metro depot. Piling through to commissioning, delivered as one programme.

- Value band
- £12m
- Duration
- 2 years
- Status
- On site
01Summary
Client, value and status at a glance.
- Client
- Metro operator
- Capability
- Rail
- Region
- South
- Value band
- £12m
- Duration
- 2 years
- Status
- On site
02The work
What it took, and where it stands.
The challenge
Three disciplines on one depot site.
A new depot needs foundations, a high-voltage supply and overhead line equipment built in a tight sequence on a single site, where a delay in one discipline stops the next.
What we are delivering
OLE, HV and civils under one programme.
Piled foundations, enabling civils, the high-voltage supply and the overhead line equipment, planned on one schedule and delivered by our own crews.
Where it stands
On site now.
Works are in progress. The package runs from piling through to commissioning under a single schedule.
03More projects
Other work in the set.

Rail Midlands
DeliveredMidland Main Line, Kettering to Wigston: energised on programme.
RC Infrastructure delivered overhead line equipment design, install, test and commission across the Kettering to Wigston section of the MML electrification programme.
Network Rail (via tier-one alliance)

Civils Scotland
On siteScotland electrification: enabling civils.
Piled foundations, access roads and troughing on a major Scottish electrification route. Sequenced to the wiring programme and handed over on each possession boundary.
Network Rail Scotland (via prime)
Next step
Delivering a similar scheme? Talk to the team behind this one.
References and full project documentation are available on PQQ or tender request.