Case study / Rail
Midland Main Line, Kettering to Wigston: energised on programme.
RC Infrastructure delivered overhead line equipment design, install, test and commission across the Kettering to Wigston section of the MML electrification programme.

- Value band
- £20m+
- Duration
- Multi-year
- Status
- Delivered
01Summary
Client, value and status at a glance.
- Client
- Network Rail (via tier-one alliance)
- Capability
- Rail
- Region
- Midlands
- Value band
- £20m+
- Duration
- Multi-year
- Status
- Delivered
02The work
What it took, and how it ended.
The challenge
A long route, wired around a running railway.
The Kettering to Wigston section had to be designed, installed and commissioned inside a series of weekend and overnight possessions, with daytime services continuing between them.
What we delivered
Design, install, test and commission as one package.
Overhead line equipment design, installation, testing and commissioning across the section, with isolation and possession planning managed by the same team.
Outcome
Energised on programme.
The section was energised on programme, with zero unplanned service disruption attributable to our works. Entry-into-service packs cleared audit on first submission.
03More projects
Other work in the set.

Rail South
On siteMetro depot electrification.
Full OLE, HV and enabling civils package for a new metro depot. Piling through to commissioning, delivered as one programme.
Metro operator

Power & HV North
DeliveredFeeder station upgrade programme.
Design and install works to upgrade protection and control on feeder stations supporting mainline AC electrification. Energised without service disruption.
Tier-one alliance
Next step
Delivering a similar scheme? Talk to the team behind this one.